Week 8 - AEE Summary
2. Environmental Management Plans
2.9. Step 3 - Monitoring
Construction Phase Requirements for AC36 include:
- Monthly monitoring of water quality
- Monitoring of water quality in response to storm events
- Review of ecological assembly within the Inner Viaduct Harbour
- Baseline samples
- Post-construction samples (Monitor potential change in water quality / ecology as a result of new structures in the CMA)
- Technical report evaluating changes
America’s Cup Venue pre-construction – image kindly shared by Ray Chang, 2020