Week 8 - AEE Summary

2. Environmental Management Plans

2.9. Step 3 - Monitoring

Construction Phase Requirements for AC36 include:

  • Monthly monitoring of water quality
  • Monitoring of water quality in response to storm events
  • Review of ecological assembly within the Inner Viaduct Harbour
  • Baseline samples
  • Post-construction samples (Monitor potential change in water quality / ecology as a result of new structures in the CMA)
  • Technical report evaluating changes

America’s Cup Venue pre-construction – image kindly shared by Ray Chang, 2020