1. Infrastructure & Traffic

New RoadsTypes of infrastructure projects which may need an assessment of environmental effects include:

  • Roads / Transport Developments (Hydrology)
  • Coastal infrastructure (Harbours)
  • Water infrastructure (Abstraction / Discharges)
  • Agriculture / Farming (Nutrients)
  • Power infrastructure (Damming)
  • Mining (Tailings- Acid)
  • Discharges (e.g. spills)

There are a multitude of assessment tools available including:

  • Noise Management Plan
  • Landscape Assessment
  • Social Impact Assessment
  • Consultation
  • CPTED
  • Integrated Transport Assessment

As we have already looked at landscape and social impact assessments, SEPTED and the benefits of consultation (in the "people" section of this course), we will concentrate mainly on noise management plans and integrated transport assessments.  However as a reminder, of key importance to the landscape assessment is the magnitude of the effect that is likely to occur.  Magnitude  is determined by considering four separate factors, namely:

  • Size/scale;
  • Geographical extent;
  • Duration;
  • Reversibility. 

 Magnitude1

Magnitude2

Social impact assessment (SIA) is a methodology to review the social effects of infrastructure projects and other development interventions.

Consultation is an ongoing, two-way process for which agreement is not always necessary but an open mind is.

Finally CPTED guidelines considers design and use, identifies which aspects of the physical environment affect the behaviour of people and then uses these factors to allow for the most productive use of space while reducing the opportunity of crime.  

CPTED concepts and principles are ideally incorporated at the design stage of a development, but can also be applied to existing developments and areas where crime and safety are a concern